CB-BW asphalt pump use

1, the installation should pay attention to the arrow on the body should be consistent with the medium flow. Thou shalt not put in place to direct dripping or splashing. Asphalt pump should be perpendicular
Up installation.

    CB-BW asphalt pump should ensure that the supply voltage is 15% -10% of the rated voltage fluctuation range of the normal work.
    3, the asphalt pump installation, the pipeline may not reverse differential pressure. And the required power for several times, officially put into use before the optimum temperature.
    4, asphalt pump installation should be thoroughly cleaned pipes. Pass into the media should be free of impurities. Valve installed before the filter.
    5, when the the asphalt pump failure or cleaning, to ensure that the system continues to run, should be installed bypass device.
    CB BW asphalt pump should be carried out on the workpiece before aging process analysis
    VSR effect depends on the choice of the VSR process. Metallurgy butterfly valve body is determined by the casting of the structural member, the shape of the asphalt pump complex, relatively rigid, convex and concave surface, uneven thickness, the residual stress is large and complex distributed. Natural aging process, there are a lot of shortcomings, a company since 2005 VSR process has made great progress in terms of product quality and production efficiency. Years of production experience: box-type parts of VSR process more complicated, you must pre-vibration process analysis, design optimized vibration parameters in order to improve the effect of the VSR.
    Failure by the vibration process specifications, asphalt pump should be carried out on the workpiece before aging process analysis, in order to achieve the purpose of saving energy and time. First, according to the workpiece material, the structure, the form of blank manufacturing process and process analysis the cabinet distribution of the residual stress field, the dimensional accuracy requirements, as well as working load, analyze the possible reasons for the failure, and other factors, and then decided to implement vibration aging process route and timeliness of key positions.
    The brief CB-BW asphalt pump Use
    Asphalt pump must develop strict technical maintenance specifications, Fuel Filter 100 hours of operation, fuel tank 500 hours cleaning time, and DC-filter the loss-breaking effect timely replacement, and shall not be removed oil. Couplings 500 hours under normal operating conditions should remove the check. In the demolition inspection asphalt pump to ensure the place, hand tools and cleaning oil clean contaminated, in order to avoid dual pieces. In the the demolition operation not Luanqiao Cookin cleaning, do not cluttered, should not wash basin and other non-dual pieces together, to avoid bumps, scrapes. In the assembly are not free to change the mounting position to achieve some purpose that does not comply with the requirements of the machine work. Valve put on a tight seat and glib tight cap, should be required torque tightened to ensure that the injectors and injection pump assembly good technical condition. Understand the structural characteristics and working principle of the dual pieces, to strengthen and improve the maintenance of the couplings, operating, trouble-free is not free to adjust not disassemble, maintenance and use, maintenance and inspection without knocking Cookin, cleaning and maintenance do not mess rub tinker with the adjustment of the assembly does not change chaos chaos screwed everything goes according to the the asphalt pump specification technical requirements, in order to prolong its life.